Project Update

The project generally consists of removing two existing 200,000 gallon water storage tanks and replacing with a single 750,000 gallon water storage tank.  The project includes replacing the existing Mingus Pump Station to meet demands and upsize the pipeline between the pump station and the new tank.

Skip to content