Project Update

The Willow Creek Road Curve Realignment Project will consist of widening Willow Creek Road through the existing curve from the Deep Well Ranch roundabout south westward to Lone Elk Trail in the Saddlewood Development. The project will be done in conjunction with the widening of Willow Creek Road from the future intersection at Warrior Way to Lone Elk Trail. The work will include widening the road to four lanes with a raised center median, and includes new traffic signals at Lone Elk Way and Warrior Way. The City is also working with APS to relocate the existing 69Kv power poles.

Skip to content