Wildwood Lift Station Abandonments


Wildwood Lift Station Abandonments

The project generally consists of the abandonment of the existing Wildwood Lift Station. The project will extend a new gravity sewer main from Wildwood Drive up to and through Highland Terrace. The project will also include the installation of approximately seven (7) private residential sewer ejector pump systems to convey the wastewater to the newly installed sewer mains.