The project will remove two aged lift stations (1958) from the collection system by extending approximately 1,500 LF of new 8-inch gravity sewer mains to serve the City parcels located on Mingus, Douglas and Delano Avenues. The existing force mains will be drained and plugged, and the existing wet wells, pumps, and electrical equipment will be removed as part of the project.

The project was identified by the Wastewater Model as a project that will increase operational efficiency of the wastewater collection system. At the completion of this project, the wastewater operations group will have two less lift stations to operate and maintain.