The project will consist of milling existing asphalt pavement, performing base preparation and placing new asphalt pavement on Brandywine Circle, East Murphy Way, East Silver Cliff Circle, East Swanlake Circle, Eagles Haven Circle, Rainbow Ridge Drive, Ranch Drive, Ravencrest Circle, San Francisco Drive, and Windspirit Circle in The Ranch subdivision. The roads included in this project are at the end of their service life and are in need of replacement.

The project includes unsuitable subgrade repairs on an as needed basis, the adjustment of utility covers to finish grade, and the restoration of disturbed traffic striping. The project also includes curb and gutter replacements.