FY18 Various Drainage & Street Improvement Projects


FY18 Various Drainage & Street Improvement Projects

The project consists of various drainage improvements associated with street drainage and neighborhood concerns regarding drainage. The following locations are included in the project:
Alarcon Alley #1 between Aubrey St. south to Lereaux St. – Project is to address drainage and sediment concerns associated with the alley.                                            Robinson Drive Storm Drain off Hill Crest Lane. A new storm drain will be installed to convey drainage into the Robinson Drive storm drain system. The alleys in the area will be paved with the project.
915 Country Club Drive – Re-design the driveway (which has been elevated over the years with pavement overlays) and drainage along the side of the road.
Divinity Circle – Remove and repave the cul-de-sac. The road is failing and drainage is currently ponding in the road during storm events.
1816 Boardwalk Avenue – reinstall scupper drain to low point of the road. Currently, the scupper drain is not in the low point of the road and drainage jumps the curbing causing erosion damage near a culvert the City maintains.
5587 Goldenrod Way – Repair erosion hazard and re-install an outlet structure that has been undermined.
Samaritan Way between Lakeview Road and Magnolia Lane -Grated drains are failing along the side of the road and the road in the area is deteriorating. The project will reinstall new catch basins and remove poor pavement sections before repaving the road.
Thumb Butte Road between 1803 and 1717 – Add curbing along the south side of the road, to prevent drainage from flooding adjoining property.