FY18 Pavement Preservation Project


FY18 Pavement Preservation Project

The FY 2018 Pavement Preservation Project generally consists of Type II Slurry Seal, Type III Microsurfacing and a cape seal consisting of rubberized chip seal topped off with Type III Microsurfacing as well as Asphalt Maltene Rejuvenating Agent and Fog Seal, crack sealing on an as needed basis, pavement repairs and the restoration of disturbed traffic striping on streets throughout the city. The project also includes curb, gutter, handicap ramps, and valley gutter replacements.