Copper Vista Lift Station Abandonment Project


Copper Vista Lift Station Abandonment Project

The Copper Vista Lift Station Abandonment Project is complete.

The Project removed an existing aged lift station from the wastewater collection system by installing approximately 250 LF of new 6-inch gravity sewer main and two new 48-inch manholes. After the removal of Copper Vista Lift Station No. 1, wastewater will be conveyed downstream to the existing Copper Vista Lift Station No. 2, where it will be collected and pumped to the existing gravity system in the area. Lift Station No. 2 will remain in operation after the project is completed.